Intel Invests in Ohio

A modern Intel office building at dusk, with a vibrant, colorful sky and light streaks above. The foreground features a parking lot with trees lining the street.

Intel Fab

Intel announces plans for an investment of more than $28 billion for two new chip factories in Licking County, Ohio.

On January 21, 2022, Intel announced plans for an initial investment of more than $28 billion in the construction of two new leading-edge chip factories in Licking County, Ohio. The investment will help boost production to meet the surging demand for advanced semiconductors, powering a new generation of innovative products from Intel and serving the needs of foundry customers as part of Intel’s IDM 2.0 strategy.

As the largest single private-sector investment in Ohio history, the initial phase of the project is expected to create 3,000 Intel jobs, 7,000 construction jobs over the course of the build, and support tens of thousands of additional local long-term jobs across a broad ecosystem of suppliers and partners.

To support the development of the new site, Intel pledged an additional $100 million toward partnerships with educational institutions to build a pipeline of talent and bolster research programs in the region.

Latest Updates

Nov. 26, 2024, Update: Intel, Biden-Harris Administration Finalize $7.86 Billion Funding Award Under US CHIPS Act

Oct. 25, 2024, Update:  Photos and B-roll video of the “Ms. Armstrong” crane added.

Most Recent Ohio One Construction B-Roll Video and Photos

Milestone Moment: Construction Goes Vertical for $28B Ohio Fab Project (B-Roll)

Ohio Construction Goes Vertical for $28 Billion Fab Project (B-Roll)

B-roll footage from September 2024 showcases the impressive crane “Ms. Armstrong” and highlights the significant milestone of going vertical in the construction of Intel’s $28 billion investment in building two semiconductor fabs in Licking County, Ohio. This milestone signifies progress in the project and reinforces U.S. chip manufacturing capabilities for the future. (Credit: Intel Corporation)

Download “Ohio Construction Goes Vertical for $28 Billion Fab Project (B-Roll)”

Download all images (ZIP, 88 MB)

Superloads Move Across Ohio

With the help of Ohio state and local authorities, Intel made multi-day trips during the summer of 2024 to move four “extra large” superloads from the Ohio River near Manchester, Ohio, to the Intel Ohio One campus.

Intel Ohio One Construction Update: Transportation of Air Separation Units (B-Roll)

Intel Ohio One Construction Update: Transportation of Air Separation Units (B-Roll)

B-roll video from June and July 2024 includes footage of transportation of a 384,000-pound air separation unit (ASU) by heavy haulers from the Ohio River near Manchester, Ohio, to the Intel Ohio One campus in New Albany, Ohio. At the campus, it will join three other ASUs for use at  new semiconductor manufacturing factories. Footage includes transport through Ohio cities including Portsmouth, Waverly, Chillicothe and New Albany, with spectators watching as workers move streetlights, signs and overhead wires to clear the path. Footage also includes interviews with Ohio Gov. Mike DeWine and New Albany Mayor Sloan Spalding on Intel’s impact in Ohio. (Credit: Intel Corporation)

Download “Intel Ohio One Construction Update: Transportation of Air Separation Units (B-Roll)”

Download all images (ZIP, 10 MB)

Site Renderings

Download all images (ZIP, 179 MB)

Intel Ohio One Campus Animation

Download “Intel Ohio One Campus Video Rendering” 

Earlier News and B-Roll Videos

Nov. 26, 2024:

March 29, 2024:

Sept. 24, 2023:

Sept. 9, 2022:

Earlier News & Events:

Additional Ohio One B-Roll Video: